Tuesday, 18 August 2015

Live Project | Town House Property Development

Town-House-Property-Development-Sheffield

Well Meadow Street
Town House Development

  • CLIENT:
  • SECTOR:
  • TYPE:
  • PROCUREMENT:
  • LOCATION:
  • PROJECT VALUE:
  • Brantingham Property Services
  • Residential
  • Design & Build
  • Tender/ Negotiation
  • Sheffield
  • £550K







The Project

Construction of a block of 2 Townhouses, each having 7 bedrooms, with shared living and utility areas, the building extending over 5 floors Project build to comply with Code for sustainable homes – level 3 and secure by design.
The building will be of Traditional Masonry Construction with engineered timber intermediate floors and the 3rd floor being part timber framed construction. The development will also benefit from a PV installation.

The Challenge


Site access and build logistically challenged.Extremely tight site.
Ensuring and maintaining the Safety and comfort of the residents occupying the adjoining Town House Block and Upper Allen Street residential development generally.

Wednesday, 15 July 2015

Live Project | Duncote Nursing Home


Unique Design Care Facility in Fantastic
 Rural Setting
Towcester, Northamptonshire


  • CLIENT:
  • SECTOR:
  • TYPE:
  • PROCUREMENT:
  • LOCATION:
  • PROJECT VALUE:
  • Minster Care Group
  • Healthcare
  • Traditional
  • Tender/ Negotiation
  • Towcester, Northamptonshire
  • Circa £3 - £4m












The Project

A New Build 47 Bed facility for Elderly Care. Build alongside an old stone built period property in extensive landscaped gardens this project will provide stunning views across open countryside for the residents to enjoy. The project consists of a Basement area for staff facilities, plant and back of house facilities. Ground and First floor area accommodate entrance and reception, admin, open and welcoming day spaces together with resident bedrooms and facilities.
The Build will take a traditional construction format with a concreted tanked basement, metal deck upper floors with insitu concrete slabs. Reconstituted Stone faced cavity walls with timber flat roof. The windows will create a fenestration that is unique with large larch framed glazed areas and timber ventilated shutters for ventilation. A larch solar shade with be provided to ensure specific areas are shaded for resident comfort.


The Challenge


Excessive tree restrictions to be maintained and worked within.Isolated site, rural location.
Challenging site access and build logistics.
Ensuring the adjacent occupied care environment is not compromised and resident/ relative comfort is maintained.

Friday, 19 June 2015

Healthcare Construction Experts Complete London Project

The Project


Pacy and Wheatley, experts in Healthcare Construction, are proud to have completed the Dartford, project in London. A remodelling project was a fast track scheme with five phases over a 25 week period, to include the formation of a new six bed resuscitation facility, major injuries, minor injuries, GP call centre, and remodelled reception and waiting areas. Liquid plastic roof coverings were also renewed over the department. This scheme was the first NHS “Unplanned Care” facility within the UK.
External works- including new gas, water and electric services, a new car park and sewer connections- have being successfully co-ordinated to ensure minimal disruption to the residents on the street.
Due to the plot being on a known bat passage the landscaping were designed to give consideration to the passing and potentially roosting animals. The end product is an attractive, well finished and beautifully landscaped building.


The Challenge


The project is on the main street in Dartford and is a Grade 2 listed building with some severe water damage to 3 rooms at the rear.
The site also has archaeological interests for the local area, so some activities require the presence of archaeologist to attend; we will see what they find.
The work can be challenging working on a Grade 2 listed building you can take 1 step forward and 2 steps back, But we are confined that we can restore the building to ensure that the building is fit for future generation.

Return to Pacy & Wheatley

Social Media Management by Multi-Web-Services

Thursday, 14 May 2015

Pinders Healthcare Design Awards | 2015

Pinders Healthcare Design Awards 2015 | Pacy & Wheatley Construction Ltd
This year, we attended the Healthcare Design Awards 2015. We are so delighted and proud to announce that Magdalen Park Nursing Home, in Hedon, has collected the Pinders Healthcare Design Award, for best New Build Care Home in the UK for 2015.

The whole team have enjoyed working on the project for the last two years and it’s fantastic to see the residents enjoying all the facilities in the Home.
Pacy & Wheatley would like to say a huge "Well Done" to all.. great result.









Click here to view the full Case Study



Return to Pacy & Wheatley

Social Media Management by Multi-Web-Services



Thursday, 26 February 2015

Yorkshire Three Peaks Challenge | Pacy & Wheatley



Members of the Pacy & Wheatley team along with friends & family have committed to taking the Yorkshire Three Peaks Challenge on 5th September of this year.

We currently have 18 intrepid individuals confirmed for the walk who shall be undertaking the challenge on behalf of Bluebell Wood Children's Hospice.

Details of how you can support the P&W team by making a donation to Bluebell Wood will follow soon.


Bluebell Wood Children’s Hospice offers care and support to children with a shortened life expectancy, both in their own homes and at our hospice in North Anston.

Bluebell Wood is a place filled with laughter and love. We give families the chance to relax, take a break and have fun, and we help support the whole family.

The walk is approx. 25miles with 3no accents and 3no descent and is expected to take around 10 hours, starting at 7 am and hoping to complete around 5pm.

The mountains of Whernside (736 m or 2,415 ft), Ingleborough (723 m or 2,372 ft) and Pen-y-ghent (694 m or 2,277 ft) are collectively known as the Three Peaks. The peaks, which form part of the Pennine range, encircle the heads of the valleys of the River Ribble and of Chapel-le-Dale in the Yorkshire Dales National Park.




Pen-y-ghent


Wherneside

The P&W team are looking forward to the challenge and we hope that you will support the very worthy cause.


Wednesday, 22 October 2014

Pacy & Wheatley

Doncaster Business Awards 2014

We are pleased to announce that we have been shortlisted for the Doncaster Business Awards 2014 as a finalist in "Success Through Innovation and Diversification." Well done team!

The Business Awards will take place on Thursday 11th December at The Doncaster Racecourse.

It is now the 16th year the Doncaster Business Awards showcase the achievements of Doncaster businesses, at one of the most prestigious awards ceremony in the region. The fourteen Business Award categories are open to businesses of all sizes and sectors and celebrate the best of Doncaster. 

Tickets are available now at www.doncaster-chamber.co.uk/events.asp?eventid=232. Priced at £55+VAT per ticket or £500+VAT for a table of ten, tickets include reception drinks and canapés, a four course meal, the awards ceremony itself (hosted by Louise Minchin, one of the country’s top journalists and presenters) and an after party including live band and DJ.




Social Media Managed by Multi-Web-Services

Friday, 1 August 2014

Nuneaton | Works Progressing

Another clear sunny day in beautiful Nuneaton…Masonry works to the ground bearing aspect of the building now complete to finished floor level.Works progressing at pace to push on through the unexpected ground conditions in the suspended slab area of the build.



Social Media Managed by Multi-Web-Services