Friday, 1 August 2014

Nuneaton | Works Progressing

Another clear sunny day in beautiful Nuneaton…Masonry works to the ground bearing aspect of the building now complete to finished floor level.Works progressing at pace to push on through the unexpected ground conditions in the suspended slab area of the build.



Social Media Managed by Multi-Web-Services

Tuesday, 29 July 2014

St James Place | Dartford

Works Continue as planned with Plank Floor installation on our Care Home Project for Curocare in Dartford, East London






Social Media managed by Multi-Web-Services

Tuesday, 15 July 2014

Pacy & Wheatley Construction | Altro Whiterock Installers

Pacy and Wheatley are approved specialist Altro Whiterock installers. The hygienic alternative to tiles or paint offers beautiful aesthetics that are practical and easy to maintain. Altro Whiterock has a seamless watertight surface that removes the threat of bacteria forming in tile grout. As a cladded system it can be installed comfortably around fixtures.

       Altro Whiterock Installers           Altro Whiterock Installers

The fully bonded system includes thermoformed pencil rounded corners giving bacteria nowhere to hide and making it easy to clean and disinfect. Hygienic cladding offers high durability and low maintenance costs making it an excellent long-term investment.
Not just white!  Pacy and Wheatley also offer Altro Whiterock Chameleon that provides an incredible array of colours to help create feature walls or simply blend in with the rest of the design decor.
       Altro Whiterock Installers            Altro Whiterock Installers
Personalised Altro Whiterock is an increasingly popular product, why not reproduce your digital photography using Altro Whiterock Digiclad. Perfect for retail and leisure, industrial and commercial where presentation is as important as hygiene.
 
Other easy to install products from Altro Whiterock include Splashbacks; Illusions featuring adstract patterns in pastel shades and satins, pure colour harmony.

Social Media Management by Multi Web Services

Friday, 4 July 2014

Pacy & Wheatley are proud to support HC One Foundation

 


HC-One

HC-One specialises in Dementia, Nursing, Residential and Specialist care with homes throughout the UK. Each of our Residents and their relatives can trust that the care they will receive will be delivered with kindness, thoughtfulness and respect, in a safe, warm, comfortable and welcoming environment.



HC-One stands for Health and Care – which is what we do – and the One, which symbolises how we do it. At HC-One we focus on the individual, striving to provide the best and kindest possible care, to the one who matters, the Resident, by the one who makes the difference, the individual member of staff.

We are a company founded on the principles of accountability, involvement and partnership with a management team of highly experienced senior health and social care professionals. We want relatives, staff, purchasers and regulators to know that we will listen to each one of you. We are on a journey to provide the kindest possible care employing some of Britain's kindest and most professional people

For more information click www.hc-one.co.uk

Click here to return to Pacy & Wheatley 


Social Media Management by Multi Web Services

Friday, 27 June 2014

Education Construction | West Yorkshire



 
The Project

Pacy and Wheatley Educational Design and Build Construction extensive project comprised the design and construction of:
A New Two Storey Post 16 Block to complement the existing adjacent science block.
A New Two Storey Science Block Extension and upgrade to the existing science block.
Alterations to Existing Training and Conference Centre.
Alterations to Existing Technology Block.
Alterations to Existing Post 16 Area within Block 6 to form New ICT Suite.
Ancillary work included external services, drainage, roads, fences, car park and landscaping work
Also included in the build was a full commercial catering facility.

The Challenge

Working within the grounds of a fully occupied and busy High School.Sensitive routing and distribution of mechanical and electrical services from the main school block to the new facilities.Working to a tight construction program to ensuredelivery of the project to achieve opening for the new school term and pupil intake.Maintaining intergrity & watertightness of shallow pitch cladded roofs during extension to science block.Control & Working over a wide spread area of the school complex, all during term time.


The Solution

Careful selection of sub contractors to ensure the highest standards were achieved.
Excellent site management and coordination of trades.
Close liasion with the clients and our design team ensured we achieved the right design solutions first time.
Use of innovative products to overcome on site design challenges.
Weekly meetings to review school logistics for pupils routes and access to ensure highest levels of safety were maintained.

Key Achievements

Project completed within 40 weeks of a 48 week program.
Highest standards achieved.
97% waste removed from site was recovered for recycling.
Health & safety: zero reportable accidents on site.
Achieving the clients budget.

Testimonials
Pacy & Wheatley have over a number of years, carried out several large refurbishment contracts which have been designed and concluded to the highest standard and within budget. So when we wanted to build a new Post 16 block we had no hesitation to award the contract to Pacy & Wheatley, once again the service was excellent and all the staff were professional, the contract was on time and budget. From a customer’s point of view a perfect partner for any building project.
Shaun Cuthbert Premises Manager Minsthorpe Academy Trust.

Click here to return to Pacy & Weatley 




Social Media Management by Multi Web Services

Wednesday, 18 June 2014

Healthcare Construction | Rotherham


Project Large Image 510 x 330

                           1st Small Image 300 x 250   2nd Small Image 300 x 250

The Project

Pacy and Wheatley Healthcare Construction project comprised three single storey extensions with the works phased to allow the centre to remain operational throughout. In addition to the construction of two consulting room extensions, the main extension was a new patient waiting area to accommodate additional services. Extensive internal works and remodelling including a new M&E installation were completed as part of the scheme, with disabled access ramps and external landscaping.

The Challenge

As the site was to remain operational throughout the course of the project it was imperative to set up the site and works to maximise access for the staff and patients. Extensive demolition to allow the new extensions were completed with the utmost care and consideration to staff and patients occupying the centre. Good management of large deliveries was essential as the site was sandwiched between a busy main road and a shared drive of a residential property.

The Solution

A phasing plan was produced following liaison with the client to ensure that areas of works were appropriately segregated from the occupied areas and members of the public. All service shutdowns were with prior arrangement and out of hours to minimise down time and disruptions.

Demolition works were carried out by hand as far as reasonably practical and any particularly heavy tasks, close to the live area, were dealt with out of surgery hours. The works were well contained with hoardings to segregate the potential hazards from the public areas.

A traffic management plan was drawn up at the start of the contract and issued to all contractors & suppliers. This helped manage the potential to disrupt a very busy route for commuters through to Sheffield city centre. We also requested deliveries to be out of peak traffic hours. A good relationship was formed and maintained with the neighbour whose shared drive had to be utilised for access to the rear of the property.


Key Achievements

The successful handover to achieve our clients pre-arranged open evening involved immense flexibility and additional work from all involved. Inclement weather throughout the project coupled with additional works meant that the programme was extremely tight; however we handed over to the client prior to the planned opening day. The project was safely managed despite the tight programme, congested working area and close proximity to the live areas resulting in zero reportable incidents.
Return to Pacy & Wheatley


Social Media Management by Multi Web Services

Thursday, 29 May 2014

Healthcare Construction | Bradford

Project Large Image 510 x 3301st Small Image 300 x 250      2nd Small Image 300 x 250



The Project

The project consisted of the construction of a new 8 bed timber frame/brick faced care home on the site of a former public house. Facilities include a sensory activity room, all en-suite rooms, an assisted bathroom, on site staff accommodation and laundry / kitchen installations.

External works- including new gas, water and electric services, a new car park and sewer connections- have being successfully co-ordinated to ensure minimal disruption to the residents on the street. 

Due to the plot being on a known bat passage the landscaping were designed to give consideration to the passing and potentially roosting animals. The end product is an attractive, well finished and beautifully landscaped building.

The Challenge

The site was on a busy road and in close proximity a busy bus terminal point. Consideration has to be given to civil works by close liaison with the highways authority and council.

Significant site remodelling and shaping was undertaken to allow the piling works and ground beam installation.

Achieving programme period with no delays to ensure a timely handover, registration and occupation.

Co-ordination of all new incoming services critical to the successful commissioning of the building.

Managing deliveries and lifting operations to ensure the busy main road directly outside the site entrance was left unaffected.

The Solution

In order to minimise disruption to the bus routes- liaison with the local bus company and highways was undertaken to ensure traffic management procedures were acceptable. The relevant permits were then obtained and the works were carried out with minimal disruption.

Initial surveys by P&W and our architect ensured that the substantial site remodelling was carried out to programme and with no unforeseen costs or delays.

Close communication with our sub-contractors, daily reviews of works and programme and a well organised site team meant that the clients handover date and subsequent registration were successfully achieved.

Pre-start meetings and weekly communication with the utility companies ensured that all aspects of the new services were considered- resulting in all being installed as required to complete and commission the building.

A site specific site transport plan was produced and communicated to all our suppliers and contractors. We also produced specific lift plans as required with contract lifts also well detailed and managed. This led to no delays or issues as a result of deliveries or lifting operations.

Key Achievements

Health Clean, crisp lines and a high standard of finish achieved through focused quality control. 

Sustainable, offsite timber frame construction methods assisted in delivering the building on time.

An end product that the design team, all contractors can be proud of- and more importantly- a fantastic end product for the service users and our client.


Return to Pacy & Wheatley


Social Media Management by Multi Web Services