Wednesday, 26 March 2014

Retail and Leisure Construction | Cambridgeshire | Costa Coffee

Project Large Image 510 x 330


The Project

Contracted and working with a respected local Doncaster Based Interior and Shop Fit contractor – Oakwood Contracts Ltd, we were appointed to completed the design, construct and fit out a new road site Costa Coffee retail unit in just 12 weeks. The project involved a full new build operation and requirements to construct additional car parking spaces. The build specification involved pad and strip foundations, structural steelwork, curved aluminium standing seam roof, cladded walls with aluminium curtain walling. All new incoming services and drainage was provided.

The Challenge

Being on the site of a current KFC Drive through restaurant presented space and logistical issues on a very constrained site with limited access for deliveries and parking.

Delivering the project with minimum disruption to the KFC business activity
The construction time line of 12 weeks.

The Solution

Early involvement in the design process and procurement to ensure all elements of the build considered the site restrictions and program for a best fit outcome.

Working closely with the client, Restaurant Regional/site Managers and professional team created a shared team approach where all inputs where valued. A collaborative and transparent approach was adopted which resulted in added value to the scheme though gains in Quality, Program and delivery management time.

Key site disruption activities such as excavation and deliveries were carried out early in the mornings to avoid busy restaurant opening hours.

Key Achievements

The project was delivered on programme to the highest quality and coffee was being served to the public 10 minutes after the successful handover meeting.

Carried out with the no disruption to adjacent KFC business activities

Excellent site management resulted in providing an outstanding finished product and on-going client relationship, promoting and leading to another project appointment at Chesterfield for a similar new build unit.

Testimonials

“Simply Brilliant, Good work ethic and planning”

Mr Raja Adil

Managing Director, Adil Group

Return to Pacy & Wheatley




Wednesday, 12 March 2014

Residential Construction | Doncaster

Project Large Image 510 x 3301st Small Image 300 x 2502nd Small Image 300 x 250



The Project

Pacy and Wheatley Residential Construction scope of works was to sub-divide the grade II listed building into two individual and luxury dwellings. The properties were to be re-named the “Brew House” and “Laundry House” to create a time capsule of the history of the
building’s former use.

Works included the full restoration and remodelling of the building including renovation of sash windows, full M&E installations, render repairs, replacement of feature windows, all to the highest standards and of a vernacular and historic style

The Challenge

Working on a rural and extremely constrained site with a high security risk due to its isolated location.

Sensitive renewal of mechanical and electrical services throughout the historic building and envelope.

Preservation of existing renders, reinstatement stone floors above newly installed under floor heating.

Formation of a bespoke spiral staircase over three floors built within a replica traditional beer vat to portray the former brewery.

The Solution

Careful selection of sub contractors to ensure the highest standards were achieved.

In the absence of any project architect, fortnightly meetings with the client and contract administrators were essential. Pacy and Wheatley Construction's Design and Build expertise assisted to provide the client and client’s agent with quick and cost effective solutions as issues arose.

Liaison and excellent relationships with the Brodsworth Estate staff were of highest priority.

Key Achievements

Project completed within a 19 week tight program.

Highest standards achieved.

97% waste removed from site was recovered for recycling.

Health & safety: zero reportable accidents on site.

Achieving the clients budget.

Pre completion sound insulation testing achieved a high score of 56db.

Project was “Highly Commended” by LABC in the 2012 building excellence awards.

Return to Pacy & Wheatley

Wednesday, 26 February 2014

KFC | Gainsborough | New Build





The Project

Appointed as Main Contractor by a UK leading KFC franchisee to construct another addition to the largest Quick Service Restaurant chain in the world - KFC, constructing a new KFC and Drive-Thru to an innovative design, in the heart of the redevelopment area of Gainsborough Town Centre

The site occupies the grounds and premise of the old Courthouse on Roseway, and Phase 1 of the works included the Demolition of the Old Courthouse which was a reinforced concrete structure. Phase 1 of the works (demolition) has already been completed by others

Phase 2 of Work involved the construction of a large single story retail unit which will now operate as a KFC with Drive thru. The building was constructed and the building process was managed by using modern methods of construction and it includes a steel frame with King span composite paneling, brick work and feature facetted glazed curtain wall cladding arrangements.
Due to previous demolition works on site foundations are driven concrete piles with reinforced ground beams. Works did also include making a new site entrance and both soft and hard landscaping to follow.
The project commenced August 2013 and was completed February 2014.

The Challenge

Overcoming made ground conditions and hidden RC Concrete underground obstructions as the works progress from the building to externals.

Ensuring the protection and safety of public at all times, as the site was bounded by pedestrian walkways.

Maintaining control of safe traffic management into and off site

Deep Drainage connections into areas of 4 way traffic.


'Finger Lickin Good'
Competition
As we have completed this project we are giving you the chance to win a free Family Feast Bucket. To enter simply follow the instruction on Facebook and Twitter.
                                     


Return to Pacy & Wheatley

Tuesday, 11 February 2014

Healthcare Construction | Leeds


Project Large Image 510 x 330

1st Small Image 300 x 2502nd Small Image 300 x 250


The Project

Pacy and Wheatley Healthcare Construction project commenced on this prominent building that stood on a large raised site overlooking local amenities, consisted of an eight bed care facility with separate annex of two self contained units suitable for more able residents. The site backed on to beautiful woodland areas which were highlighted and open. The facility enjoyed lounge areas, kitchen dining room and specialist sensory area for relaxation. The terrace area was constructed to provide a peaceful retreat for residents to enjoy, complete with discrete systems to comply with the CSCI regulations. The front of the building was carefully landscaped around the large sloping car park with secure fencing to enclose the rear. The project is an OSC timber frame building clad with brick, render and art stone ensuring clean lines and pleasing aesthetics.

The Challenge

To produce a first class zero defects product for a valued client. Dealing with surface water run off from the higher forested ground to the rear. To complete the project on time and on budget. Battle with continued heavy snowfall throughout the build period. Ensure minimum disruption to local businesses and neighbours. Enable compliance with CSCI regulations and achieve an air test under 5.0.

The Solution

Utilise competent in house staff for the project who have a previous relationship with the client. Due to the inclement weather conditions, all efforts were put into getting as much groundworks completed at an early stage of the scheme. It was also imperative to ensure the timber frame was erected and sealed as soon as possible to ensure works could continue internally.

Key Achievements

Air permeability test achieved a very presentable 3.19. Arboriculture protection requirements were upheld fully on a very tight site. Our client was presented with a high standard of finish giving patients comfortable surroundings from the improved services. Working closely with flexible, local contractors to ensure the phased handovers were successfully completed.

Return to Pacy & Wheatley


Thursday, 6 February 2014

Education Construction | Scunthorpe

Project Large Image 510 x 330

1st Small Image 300 x 2503rd Small Image 300 x 250

The Project

Pacy and Wheatley Educational Construction project was to create a conference and training facility to the first floor of an existing building. The work consisted of the demolition of a part completed scheme, the installation of new stud walls, ceilings, windows and lift to create office space, toilets, kitchen facilities and a room for training and conferences. In addition to internal work a number of remedial works we’re made to the externals improving the aesthetics of the building.

The Challenge

Working on a very constrained site with limited access for deliveries and parking.

Delivering the project with minimum disruption to neighbours, the general public and staff working on the ground floor.

Ensuring segregation of both the general public and staff from construction work.

Dealing with unforeseen structural problems with the building at the design stage.

The Solution

During the project, a number of chimney stacks we’re found to be unsafe and requiring further support. As the client’s budget was extremely tight, first rate communication between Pacy & Wheatley Construction and the structural engineers was required to achieve our goal within budget. To minimise disruption to neighbouring businesses deliveries were arranged at off peak times. This guaranteed efficient progress of the project, whilst ensuring the satisfaction of North Lincolnshire Homes’ neighbours.

To ensure the safety of both North Lincolnshire Home’s staff and the general public, fencing was erected to provide good segregation. Daily communication between Pacy & Wheatley and North Lincolnshire Homes throughout the project guaranteed the safety of all parties during our works.

Key Achievements

The project was delivered within an extremely tight budget, to the client’s full satisfaction.

Carried out with the minimum disruption to staff occupying the building throughout the duration of the project.

Excellent site management resulted in providing an outstanding finished product.

The successful installation of a lift within the constraints of the existing building.

Testimonials

Pacy and Wheatley Construction carried out the works in a professional manner and with minimal disturbance to the ground floor premises, which were occupied throughout the contract. Additional works that were required to deal with unforeseen structural issues were dealt with promptly and economically. The additional works required an extension of time which was amicably agreed and the project was completed on time and within budget.
Hugh Ashby, Architect, John Hill Associates.

Return to Pacy & Wheatley

Friday, 17 January 2014

Interior Refurbishment | Staffordshire

Project Large Image 510 x 330

1st Small Image 300 x 2503rd Small Image 300 x 250


The Project

The Pacy and Wheatley Interior Refurbishment project consisted of the extensive remodelling of a three storey, eight bedroom former private house set at the end of a secluded, cobbled road in landscaped gardens, overlooking the picturesque valley below. Due consideration and close liaison had to be given to the conservation officer, to ensure materials used were in line with the areas requirements. Extensive amounts of asbestos pipe lagging were found from day one which required stripping out and disposal. New works comprised tanking to the basement area to accommodate new meeting rooms. A totally new mechanical, plumbing and electrical installation. New stud wall partitions and ceilings to form two studio rooms with eight further en-suite bedrooms. Some of the building’s existing interior and exterior features were maintained with a full refurbishment programme carried out to the timber sash windows.

The Challenge

Ballington House is located at the end of a private, cobbled road which had to be kept clear at all times for resident access. Furthermore the drive entrances were extremely tight. This made deliveries particularly difficult. Presence of a substantial amount of asbestos meant potential delays to the commencement of the project and delays to the overall programme and project handover. Our client had residents already nominated for the rooms, so a quick project turnaround was essential.

The Solution

Discussion with suppliers and contractors took place at the earliest opportunity to ensure that the smallest possible delivery vehicles were used to minimise disruption to the residents on the access roads.

Pacy & Wheatley Construction worked closely with the asbestos removal contractor to develop a plan and sequence of air locks. This allowed parts of the building to remain safely accessible to continue working, thereby reducing the programme delays by approximately 50%. The premises could now be occupied sooner providing a huge benefit to the client.

Key Achievements

Providing a high quality end product for our client with particular emphasis on maintaining and refurbishing key original features within and on the facade of the building.

Working with our local & national suppliers to ensure that minimum, or no, disruptions were caused to the local residents. Lateral thinking removed potential delays to hand over to our client.

Testimonials

‘I have worked closely with Pacy and Wheatley Construction over a number of years with different Health Care organisations, ranging from residential elderly to low secure mental health. In that time Pacy and Wheatley Construction have delivered numerous successful projects ranging from intricate refurbishments of operational facilities with complex user groups, through to delivery of major developments on complex brown field sites. The customer service, understanding of our user groups and ability to deliver projects within complex operational constraints has cemented a long standing working relationship between the organisations I have worked with and Pacy and Wheatley Construction. I would recommend them to any serious healthcare development organisation.
Neil Pownall, Head of Property, HC One (Formerly of Lighthouse Healthcare)

Return to Pacy & Wheatley

Thursday, 2 January 2014

Education Construction | Dearne Valley College | Pacy & Wheatley Construction

Project Large Image 510 x 330

1st Small Image 300 x 2503rd Small Image 300 x 250


The Project

Pacy and Wheatley Educational Refurbishment and Construction project was to perform a complete refurbishment on a building used for joint purposes. The building housed a cafĂ© with bar facilities alongside a pool room, as well as a small area used for beauty purposes. The brief entailed the transformation of the building into a new hair and beauty training facility, which would also be available for commercial use and hire by those in the beauty industry. The building needed stripping back to the basics, including M&E and the demolition of internal walls so that new areas could be constructed. The building required new toilets and suspended ceilings, as well as separate treatment rooms and the installation of a set of bespoke furniture in line with the theme of the project. A number of old services required adaptation to suit the new function. To finish the project, it required new floor coverings throughout, and a new flat roof was constructed, included specific roof openings to maximize the use of natural light.

The Challenge

The College required the project to be fully completed for the beginning of the new academic year in September, with the work taking place throughout the summer break. This allowed for a period of 6 weeks work, with a programme requiring 10- 12 weeks. During the project, a number of design alterations were implemented adding to the challenge of the project, which included a new water main installation to account for the increased water usage of the building. This would take place over a working and busy car park. Asbestos was also found and dealt with during the strip out phase of the project.

The Solution

The project required a certain level flexibility, with the surrounding area also serving a busy nursery and an on-site fitness suite, both of which were in full use during the 6-week period. The new water main was laid and completed out of working hours to ensure minimal disruption, and the asbestos was inspected and removed successfully and efficiently. The project required excellent site management to ensure safety and efficiency, while adhering to the deadline and time frame set out. Sub contract and supplier orders were placed in good time to ensure the necessary materials were on site without delay, and a level of ‘accelerated working’ was implemented to achieve the design alterations given, during the project. The supply chain proved to be a credit with flexible working hours and maintained full co-operation with the site manager.

Key Achievements

The finished project exceeded the expectations of both the staff at the college, and the students who used it’s facilities.
The project was completed within the timeframe and deadlines set, with no disruption to the surrounding area and businesses.